Tuesday, August 27, 2024

Special Topics- Data Quality- Standards- Module 2

 This week we used the standards set by the National Standard for Spatial Data Accuracy (NSSDA) to determine positional accuracy of a provided road network. The positional accuracy of the test data was compared to an established data set as well as to reference points obtained to orthographic images of the study area.


To determine accuracy we chose a sampling of 20 points meeting specific criteria (no less than 4 per quadrant, greater than 10% of the diameter in distance from other points) along intersections. We established reference and testing feature classes for each intersection. 





After creating our feature classes we added XY coordinates to the data. We used excel to calculate the RMSE and NSSDA values.

Based on my results I determined the following about the positional accuracy of each data set:

The ABQ street data tested  4.18 feet horizontal accuracy at 95% confidence level.

The Street Maps USA data tested 434.85 feet horizontal accuracy at 95% confidence level.


Wednesday, August 21, 2024

Special Topics- Calculating Metrics for Spatial Data Quality- Module 1

 This module covered spatial precision, accuracy and bias. We also learned how to calculate root-mean-square error and cumulative distribution function.

Accuracy refers to the closeness of a collected data to an accepted reference point, while precision refers to the agreement between the data points. 

To determine accuracy we created a feature class with a single feature that represented the average of the latitude and longitude of all the collected data. We then compared this with a provided reference point that represented the "true" value.

To determine precision we spatially joined the average point feature class with the original point data feature class to obtain a distance attribute calculation. We calculated the distance of 50, 68 and 95 percentiles of the data from the average location, and used the buffer tool to create a visual representation of the percentiles. After determining the horizontal precision and accuracy we then determined the vertical precision and accuracy using the altitude data.

Our horizontal accuracy was 2.97 meters while our horizontal precision was 4.17 meters. 

Sunday, August 4, 2024

Module 6- Least Cost and Corridor Analysis- Applications in GIS

 The second part of our final module in Applications covered least cost path and corridor analysis using cost surfaces. We worked with two scenarios. For the first scenario we analyzed slope, river crossings and river proximity to determine the best single possible location for a new pipeline within a given study area. We then took this information a step further and presented a corridor analysis. To do this we reclassified our features with their cost factor and utilized the Cost Distance and Cost Path tools.



Image 1


First we assessed for slope alone. As you can see this first image contains 4 water crossings. 

Image 2


After adding the addition cost value of the river crossing the adjusted pathway only contained two water crossings (yellow). However, we further adding a 3 raster feature layer to the cost analysis for river proximity. This gave us the final path in image 2 (red).
Image 3

    Finally, we used the corridor tool to get a corridor analysis of the data. Image 3 depicts a copy of the final least cost analysis overlaying the corridor analysis



    After establishing the basics of performing a corridor analysis we were tasked with determining the most likely corridor for black bear migration between two protected areas of Coronado National Forest. We evaluated suitability based on slope, proximity to roads, and landcover surveys. 
    After giving suitability ratings to each of my variables, I ran a weighted overlay to establish the importance of each variable for the cost surface. I ran my cost surface in the cost distance tool with each protected area to create two rasters for the corridor output. When running the corridor analysis I got a very widespread result that I wanted to narrow down. To do this I created an empty polygon feature class for my proposed corridor and drew a polygon around the most suitable of the corridors. I then clipped my raster to my proposed corridor.

Here is my final map:


 




Friday, August 2, 2024

Module 6- Suitability Analysis- Applications in GIS

This week we ran both vector and raster suitability analyses in ArcGIS Pro.

For Scenario 1, we were tasked with identifying suitable Mountain Lion habitat based on slope, landcover, and distance from rivers and highways. To do this we created slope and landcover Boolean grids as well as highway and river buffers. We ran the same data 2 different times to practice working with both raster and vector tools and methods of analysis. We combined our layers and assessed what polygons fit our suitability requirements.

Areas suitable for Mountain Lion habitat

For Scenario 2 we were given a study area and data and tasked with identifying how much land in the area was suitable for development. While the output of the prior exercise was just the polygons suitable for habitat, for this exercise we used a suitability rating. We reclassified our Land Cover classes based on suitability rating with agricultural and grassland landcover being most suitable for development and water, wetlands and urban areas classified as least suitable. We also gave suitability ratings to the soil class, slope and created buffers around the rivers and roads. After reclassifying our rasters, we used the Weighted Overlay tool to give weight to each class. We ran two scenarios, one with equal weight and an alternative scenario with more weight given to certain classes (slope) and less given to others (distance to roads). The weighted overlay tool gave me issues before I realized that it wasn’t keeping the suitability ratings I gave to my raster and was instead trying to reclassify them for an unknown reason.



Sunday, July 28, 2024

Module 5- Damage Assessment- Applications in GIS

This lab was a continuation of last week's as we again worked with Hurricane Sandy damage data. This time the output was hurricane track map as well as a structural damage assessment and analysis. To perform our damage assessment we created a feature class with all the attributes we wanted to collect data on. We created fields for structure damage, wind damage, inundation and structure type. These would be valuable data points to collect in the field, but for the purpose of this lab we were limited to what we could collect visually using remote imagery. We created raster mosaics for pre and post hurricane. Toggling between these two rasters, we created point features on each of the structures present, assessed and rated their level of damage on a scale of 0 (no damage) to 4 (completely destroyed) for a pre-defined area of interest. After completing and symbolizing my data I created a polyline feature class  to represent the coastline and parsed the data into damage category and distance from the coastline. My results are as follows:








Monday, July 22, 2024

Module 4- Coastal Flooding- Applications in GIS

 Increased occurrence of coastal flooding and sea level rise are two effects of climate change that threaten coastal cities. This week we performed a coastal flooding assessment to compare the rate of damage before and after Hurricane Sandy hit the New Jersey coastline. Then we used elevation models to delineate coastal flood zones in Naples, Florida.

For our hurricane damage assessment, we subtracted the pre-Sandy raster from the post-Sandy raster. It was very clear when inspecting the resulting rate of change raster what areas had the greatest concentration of damage. We then compared the resulting image to a building footprint from 2019 that showed what buildings were present at that time.



After learning how to use the reclassify and region grouping tools to create a predictive map of a storm surge, we created a map using two elevation models, a USGS DEM and a LiDAR derived DEM to predict areas and buildings effected by a 1-meter storm surge. We then analyzed the type of buildings affected and, presuming the LiDAR data was more accurate the errors of omission and errors of commission associated with the data.




Saturday, July 13, 2024

Module 3- Visibility Analysis- Applications in GIS

    This week’s lesson centered around 3D visualization techniques in ArcGIS as well as performing line of sight and viewshed analyses. Before working with 3D visualization there are several important core concepts to understand.

     We covered how to determine which of the 3 elevation types to utilize and how to set or change elevation type in ArcGIS Pro. The 3 elevation types are:

    - on the ground (typically used for vegetation or buildings)

                - relative to the ground (traffic cameras, subsurface features)

                -an absolute height (airplane paths, satellites)

    Other important terms are:

        -  cartographic offset, or adjusting the height of an entire layer so that the features are not obscured by others layers within the scene. In our case the houses were obscured by the trees, so we set the cartographic offset to 50 to make them visible.

        - vertical exaggeration, emphasizing vertical features on a map, particularly useful in cases where the horizontal extent is vast.

                          This image gives and examples of cartographic offset. The red dots represent houses in the  neighborhood. However, without sufficient cartographic offset some of the houses were obscured. 50 feet was sufficient to see all the houses clearly.

    We covered the process of extruding data. Extruding data from a 2D to a 3D feature can be a way to visualize more than just the literal dimensions of an object. For our exercise we extruded building using their absolute value in order to visualize the most valuable properties in a city.

For this map the yellow symbolizes residential properties, the pink represents commercial properties and the gray represents public housing. The height of the buildings isn't their actual height but instead representative of their absolute property value.

  Additionally we covered how to apply visual effects using symbology, and setting illumination properties for global and local scenes to see the effects of shadows and illumination on the scene. 

    After we covered introductory 3D concepts we performed both a line of sight analysis and a viewshed analysis. 

    The 3 main steps to performing a sight line analysis are to determine observers and targets, construct sight lines, and determine lines of sight. We used ArcGIS 3D analyst tools to complete these steps. We considered line of sight from 2 observation points along a parade route we considered only those with visibility within 600ft which left clear gaps in coverage from a security standpoint.

                        The centermost portion of the parade route was completely absent of coverage with the line of  sight analysis at 600ft.

For our viewshed analysis we assessed a proposed campground lighting system to determine what height was necessary to obtain sufficient campsite coverage.


Viewshed analysis photos assessing a proposed campground lighting system. Ideal coverage was more than 2 observers.
    
    Finally we covered how to create a site-specific 3D scene in ArcGIS Pro from 3D datasets. One important tip I took note of in this section is that when you are extruding features from 2D to 3D symbology (such as a building), one way to ensure accuracy is to extrude the features at an absolute height, and then convert the newly extruded features to multipatch features before switching the elevation type to "on the ground". Drawing at an absolute height ensures the slope of the terrain doesn't interfere with the rendering of the feature, and if you change the elevation type before converting the data to a new feature class it will not keep the features as they were drawn at an absolute height but will re-draw them at ground level. I also found it worth noting that extruding the features does not automatically make a new, shareable 3D feature class.

    Overall I feel like this exercise gave me new insight into what 3D tools and options are available to me with ArcGIS Pro.


-   

- 

GIS Portfolio

 We were tasked to create a GIS portfolio for our internship program. It was a great opportunity to put organize the work I have been doing....